logo

Cement Blanket for Slope Protection - Anti-Erosion Solution for Hillsides, Embankments & Road Slopes

80㎡
MOQ
Inquire anytime
prezzo
Cement Blanket for Slope Protection - Anti-Erosion Solution for Hillsides, Embankments & Road Slopes
Caratteristiche Galleria Descrizione di prodotto Richieda una citazione
Caratteristiche
Specificazioni
Materiale: Fibre tessili e polvere di cemento
larghezza: 4m
Lunghezza: 20m-50m
Evidenziare:

cement blanket for slope protection

,

anti-erosion cement blanket

,

hillside protection cement blanket

Informazioni di base
Luogo di origine: Cina
Marca: JIANYI
Certificazione: ISO9001
Termini di pagamento e spedizione
Imballaggi particolari: Imballaggio esterno impermeabile e impermeabile alla polvere
Tempi di consegna: 5-8 giorni lavorativi
Termini di pagamento: T/T
Capacità di alimentazione: 600t/month
Descrizione di prodotto
Cement Blanket for Slope Protection
Anti-Erosion Solution for Hillsides, Embankments & Road Slopes
Product Overview
Our Cement Blanket is a flexible, easy-to-deploy slope protection material constructed from high-tensile fiberglass mesh and premium Portland cement. The unique structural design ensures excellent adhesion to slope surfaces, forming a dense, crack-resistant protective layer with high compressive and tensile strength after hydration.
Key Advantages:
  • Lightweight in dry state for easy transport to remote locations
  • No heavy construction machinery required for installation
  • Superior erosion resistance and structural stability
  • Flexible application on various slope configurations
Application Scenarios
Ideal for comprehensive slope protection projects including highway and railway embankments, mountain slopes, riverbank revetments, and mine dump slopes. Effectively prevents soil erosion from rainwater scouring and landslides caused by soil loosening.
Technical Specifications Details
Maximum Slope Angle Up to 60 degrees
Application Areas Rural and urban environments
Environmental Integration Can be covered with soil for vegetation growth
Construction Process
  1. Slope Preparation: Trim slope to remove weeds, tree roots, and loose soil; level uneven areas and compact the surface thoroughly.
  2. Blanket Laying: Unroll cement blanket from top to bottom of slope, ensuring tight fit; overlap adjacent sheets by 12-18cm and secure with U-shaped nails (spacing: 50-80cm).
  3. Watering & Curing: Spray water gently and evenly until blanket is fully soaked; cover with plastic film in strong sunlight or rain conditions. Initial hardening: 3-5 days. Full strength: 7-10 days.
Prodotti raccomandati
Mettetevi in ​​contatto con noi
Persona di contatto : Ms. Zhang
Telefono : 86-13332517898
Caratteri rimanenti(20/3000)