logo

Cement Blanket for Agricultural Irrigation Canals - Water-Saving, Easy-Install Liner for Farm Irrigation

80㎡
MOQ
Inquire anytime
prezzo
Cement Blanket for Agricultural Irrigation Canals - Water-Saving, Easy-Install Liner for Farm Irrigation
Caratteristiche Galleria Descrizione di prodotto Richieda una citazione
Caratteristiche
Specificazioni
Materiale: Fibre tessili e polvere di cemento
larghezza: 4m
Lunghezza: 20m-50m
Evidenziare:

cement blanket for irrigation canals

,

water-saving farm irrigation liner

,

easy-install cement blanket liner

Informazioni di base
Luogo di origine: Cina
Marca: JIANYI
Certificazione: ISO9001
Termini di pagamento e spedizione
Imballaggi particolari: Imballaggio esterno impermeabile e impermeabile alla polvere
Tempi di consegna: 5-8 giorni lavorativi
Termini di pagamento: T/T
Capacità di alimentazione: 600t/month
Descrizione di prodotto
Cement Blanket for Agricultural Irrigation Canals
A cost-effective, water-saving liner solution specifically designed for farm irrigation systems. This lightweight, easy-to-transport cement blanket delivers exceptional waterproof performance to minimize water seepage in agricultural applications.
Key Benefits: Reduces water loss by up to 80% compared to unlined canals • Non-toxic and environmentally safe • Protects irrigation water and farmland soil from contamination
Application Scenarios
Ideal for lining agricultural irrigation canals, farmland furrows, and small-scale water delivery channels. This solution helps farmers conserve water resources, improve irrigation efficiency, and maintain consistent water flow to various crops including vegetables, grains, and fruits.
The cement blanket adapts to uneven farmland terrain, can be installed on both new and existing canals, and demonstrates excellent resistance to damage from farm machinery and animal activity.
Installation Process
1. Canal Preparation
Clean the canal surface thoroughly, removing all weeds and loose soil. Level the bottom and sides, filling uneven areas with soil and compacting firmly.
2. Blanket Installation
Roll out the cement blanket along the canal from upstream to downstream. Overlap adjacent sheets by 10cm and secure edges with soil or wooden stakes for stability.
3. Watering & Curing
Spray water evenly across the blanket surface until fully saturated using a bucket or sprinkler. Allow 24 hours for initial hardening. Irrigation can resume after 3 days, with full strength achieved within 7 days.
Prodotti raccomandati
Mettetevi in ​​contatto con noi
Persona di contatto : Ms. Zhang
Telefono : 86-13332517898
Caratteri rimanenti(20/3000)